Portfolio

WICKENBURG TIRE CENTER

Sletten Companies

WICKENBURG, AZ

Scope of Work: Site work for a new tire center in Wickenburg Arizona to include grading for sidewalks, curbs, concrete pads and asphalt paving. Installation of storm drainage, side sewer, water main, fire sprinkler main and domestic water service.

BAGDAD SCHOOL EXPANSION

Low Mountain Construction

BAGDAD, AZ

Scope of Work: Demolition and site work for a new building at the Bagdad High School. Project scope of work consisting of- site hardscape and utility demolition, over excavation and placement of structural fill, versa-lok retaining wall and storm drainage.

VA HOSPITAL

Povolny Group

PRESCOTT, AZ

Scope of Work: Trenching and backfill for new electrical service for the VA hospital including hardscape demolition, export of trench spoils, import of trench backfill and prep for asphalt paving and concrete sidewalks.

JOINT BASE LEWIS

Pease Construction

MCCORD, WA

Scope of Work: Fire Sprinkler Main replacement for the US Army Core of Engineers to include – Installation of approx. 9000 LF of 18”, 16” and 12” water main to include hydrants, service lines, fire sprinkler lines and connections to existing mains. Abandonment and abatement of AC mains after putting the new system into service.

THURSTON COUNTY READINESS CENTER

Pease Construction

TUMWATER, WA

Scope of Work: Site work and utilities for a new WA State National Guard Readiness center. Project scope included import and placement of over 30,000 cubic yards of structural fill. Installation of over 1000 linear feet of 12in water main, 500 linear feet of 8in sewer main and prep for over 100,000 sqft of building slab and 60,000 sqft of porous concrete pavement.

SHADY LANE/HICKS LAKE

Waunch Construction & Trucking Inc.

LACEY, WA

Scope of Work: This contract provided for the installation of approximately 6,000 LF of 4-inch, 6-inch, 8-inch, 10-inch, and 12-inch diameter water main and 5,900 LF of 2-inch, and 8-inch diameter sewer gravity main and sewer force main along Shady Lane Rd SE. Work to include water and sewer service lines, meters, valves, transfer of water services, connections to existing water and sewer systems, water main abandonments, pavement and lawn restoration and other work.

SHELTON DOWNTOWN CONNECTOR

Waunch Construction & Trucking Inc

SHELTON, WA

Reconstruction of over 2 miles of road in the city of Shelton. Project scope included new asphalt roadway sidewalks, curbs, storm drain, a round about, new street lighting and stop lights/signal.